PPG supplies coatings for Port of Miami Tunnel

29 September 2014

PPG Industries’ coil and building products group announced that it supplied Duranar XL and Duracron coatings to the recently opened Port of Miami Tunnel, which is made up of two 4200-foot-long highway tunnels that travel under Biscayne Bay, connecting the MacArthur Causeway on Watson Island to the Port of Miami on Dodge Island.
Duranar XL coating specified by Arquitectonica, the Miami-based architectural firm that designed the tunnels is a three-part coating system consisting of a urethane primer coat, a decorative colour coat and a protective fluoropolymer clearcoat. Arquitectonica selected Duranar XL Crystal Blue coating to cover the 4000 metal panels lining both sets of tunnel walls.
As many as 16,000 vehicles/month are expected to travel through the twin underwater tunnels, which opened to traffic on August 3.

< Previous article

Sun Chemical and DIC Experts to Speak about Modern Ink Developments for Plastic Cards

Next article >

BASF gets award for Cathoguard 800 from PSA Peugeot Citroën